Syllabus 2 — Project-driven milestones
Syllabus 2 — Project-driven milestones
Open images · Containerlab · theory only when blocked.
| M | Build | Theory pulled |
|---|---|---|
| M0 | Host ready; first deploy/destroy | Linux net, images |
| M1 | Triangle routers, static + pcap | IP, static |
| M2 | Multi-switch VLANs/trunks | Bridging, tags |
| M3 | Loop-prevention failover | Spanning tree family |
| M4 | IGP single area | Link-state basics |
| M5 | Multi-area IGP | Hierarchy, filtering |
| M6 | Dual-homed edge routing | Inter-domain, policy intro |
| M7 | First-hop HA + relay | Resilience, services |
| M8 | Filters + edge translation | ACL thinking, NAT |
| M9 | Site tunnel | Overlay basics |
| M10 | Mini leaf-spine | Fabric underlay |
| M11 | Overlay fabric taste | VXLAN/EVPN-class ideas |
| M12 | Automate config against lab | NetOps scripting |
| M13 | CI smoke deploy | Lab-as-code |
| M14 | Capstone multi-site | Integration |
Each M: .clab.yml · address plan · expected state · break · recovery · diagram.